Coverage of the Sept. 29 and 30 405 Freeway closure

Carmageddon Survival Guide 4 You

Here's the 411 on the 405 Freeway closure from NBC4

By Jonathan Lloyd
|  Friday, Sep 28, 2012  |  Updated 12:08 PM PDT
View Comments (
)
|
Email
|
Print
Carmageddon Survival Guide 4 You

Getty Images

Construction workers shut down an on ramp to the Interstate 405 on Sepulveda Boluevard.

advertisement

The San Diego (405) Freeway will be closed in both directions this weekend for demolition of the Mulholland Drive Bridge as part of the Sepulveda Pass improvement project.

Here are the basics:

When: Saturday and Sunday, 24 hours each day. On-ramps and lane closures will begin at 7 p.m. Friday. The freeway will reopen Monday at 5 a.m. Ramps and connectors will reopen by 6 a.m.

Where: The northbound 405 Freeway will be closed from the Santa Monica (10) Freeway to the Ventura (101) Freeway. Southbound lanes will be closed from the 101 Freeway to the Getty ramps.

Why: The freeway widening project along a 10-mile stretch of the 405 Freeway requires demolition of the Mulholland Drive Bridge. The north side of the bridge will be reconstructed during the next 12 months.

Getting Around: Regional Map | North Closure Plan | South Closure Plan | Detour Maps | More Maps

MORE:

Get the latest headlines sent to your inbox!
View Comments (
)
|
Email
|
Print
Leave Comments
What's New
Running Dry
Coverage of the California drought. Read more
Follow Us
Sign up to receive news and updates that matter to you.
Send Us Your Story Tips
Check Out